Skip to content
SKILLAGILITY
  • Your Learning Hub
  • Our Services
  • Our Experts
    • Stefan Lachmann
  • Our Courses
  • |
  • About SKILLAGILITY
  • Book a Call
SKILLSTER'S Place
SKILLAGILITYSKILLAGILITY
  • Your Learning Hub
  • Our Services
  • Our Experts
    • Stefan Lachmann
  • Our Courses
  • |
  • About SKILLAGILITY
  • Book a Call
SKILLSTER'S Place
EN
  • German
SKILLAGILITYSKILLAGILITY

Lean Six Sigma Essentials

  • DMAIC Roadmap
  • System Interaction Map

01 DEFINE

  • VOC Translation Matrix
  • CTQ-Tree
  • Kano Model
  • Is/Is-Not Method
  • SMART Goals
  • SIPOC
  • In/Out-Frame
  • Stakeholder Matrix
  • Cost of Poor Quality (COPQ)
  • DMAIC Milestone Plan
  • Project Charter
  • Define Tollgate Checklist

02 MEASURE

  • Parking Lot
  • Detailed Flowchart
  • Swimlane Diagram
  • Y=f(X) Cascade
  • Data Collection Plan
  • Sample Size
  • Measurement System Analysis
  • Chart Selection Guide
  • Brown Paper Approach
  • Baseline & Sigma Level
  • Measure Tollgate Checklist

03 ANALYZE

  • Fishbone Diagram
  • 5S Quick Wins
  • Spaghetti Diagram
  • Work Sampling (MMA)
  • Yamazumi Chart
  • Scatter Plot & Correlation
  • 5 Whys
  • Affinity Diagram
  • Pareto Analysis
  • Interrelationship Diagraph
  • FMEA
  • Hypothesis Test Selector
  • Analyze Tollgate Checklist

04 IMPROVE

  • 7 Wastes (TIMWOOD)
  • Standard Operating Procedure (SOP)
  • Poka-Yoke
  • SMED (Quick Changeover)
  • Kanban (2-Bin System)
  • Brainwriting 6-3-5
  • SCAMPER
  • Pick Chart
  • Pugh Matrix
  • Pilot Plan
  • Rollout Plan
  • Improve Tollgate Checklist

05 CONTROL

  • Control Plan
  • Control Chart (SPC)
  • Visual Controls
  • Kamishibai
  • OEE & TPM
  • Handover Checklist
  • After Action Review
  • Final Tollgate Checklist
View Categories
  • Home
  • Resources
  • B303 Lean Six Sigma
  • 01 DEFINE
  • Cost of Poor Quality (COPQ)

Cost of Poor Quality (COPQ)

0:00 / 0:59
  • View as Markdown Open this page as plain Markdown (opens in a new tab)
  • Open in ChatGPT Ask questions about this page (opens in a new tab)
  • Open in Claude Ask questions about this page (opens in a new tab)
  • Open in Google AI Studio Ask questions about this page (Google account required) (opens in a new tab)

DefectsAn error, flaw, or non-conformance in a product or service that fails to meet a specific Critical-to-Quality (CTQ) requirement or Specification Limit. A single unit or service can contain multiple defects. In Six Sigma, the goal is to define, measure, and eliminate these occurrences. Click term for full definition and mistakes cost money, but most of these costs stay hidden. Calculating the Cost of Poor QualityThe Cost of Poor Quality (COPQ) is the cost incurred because a product or service was not made right the first time: the price of defects, mistakes and inefficiencies. It covers internal and external failure costs. Click term for full definition turns your problem into a business case your sponsor understands. Watch the short video, then work with the toolkit PDF: it explains the method, shows a worked example and gives you a blank template to fill in.

Tool video

The short tool video will appear here.

Cost of Poor Quality in short

  1. List the failure costs. Collect all internal and external failure costsExternal Failure Costs (EFC) are costs of defects found after the customer receives the product or service, such as warranty claims, complaints, returns and lost sales. Click term for full definition linked to your problem.
  2. Put a number on each. Use finance data where possible, careful estimates where not.
  3. Add them up. Calculate the current COPQ per month or per year.
  4. Apply your goal. Multiply the COPQ by the expected reduction from your SMARTA standard for writing project goals. A SMART goal is Specific, Measurable, Achievable, Relevant and Time-bound, so everyone knows exactly what success looks like and by when. Click term for full definition goal.
  5. Separate hard and soft savingsReal, measurable benefits that do not directly or immediately impact the P&L statement, or that relate to cost avoidance rather than cost reduction, such as productivity gains or higher satisfaction. Click term for full definition. Only hard savingsTangible, measurable savings that directly and immediately impact the Profit & Loss (P&L) statement, such as less rework, less scrap or lower material costs. Click term for full definition directly hit the P&L; list soft savings separately.

Key points

  • COPQ = internal + external failure costs.
  • Most quality costs are hidden below the waterline.
  • Projected saving = COPQ × expected reduction.
  • Keep hard and soft savings apart.

Related tools: SMART Goals · Project Charter · VOC Translation Matrix

© 2026 - SKILLAGILITY. All rights reserved.

 

  • Contact
  • Help & FAQ
  • Site Notice
  • Privacy Policy
  • Terms and Conditions
  • Cancellation Policy
  • Accessibility Statement
Accessibility Adjustments

Powered by OneTap

How long do you want to hide the toolbar?
Hide Toolbar Duration
Wählen Sie Ihr Barrierefreiheitsprofil
Sehbehinderten-Modus
Verbessert die visuellen Elemente der Website
Anfallssicheres Profil
Entfernt Blitze und reduziert Farben
ADHD-freundlicher Modus
Fokussiertes Browsing, ablenkungsfrei
Blinden-Modus
Reduziert Ablenkungen, verbessert den Fokus
Epilepsie-sicherer Modus
Dämpft Farben und stoppt Blinken
Inhaltsmodule
Schriftgröße

Standard

Zeilenhöhe

Standard

Farbmodule
Orientierungsmodule